Kottavalasa-Koraput Doubling Railway Line Project

Kottavalasa-Koraput Doubling Railway Line Project

Authority:East Coast Railway
Location:Andhra Pradesh (India)
Project Overview:
  • The Kottavalasa-Koraput Doubling Project aims to enhance rail connectivity.
  • It spans from Km. 45.483 to Km. 72.550, connecting Shivalingapuram Station to Borraguhalu Station.
  • The project falls within the Waltair Division of the East Coast Railway.

Construction Tasks:
  • Earthwork in formation and Blanketing.
  • Minor bridges, Drains, and Barricading.
  • Protection works.
  • Construction of Major Bridges:
    • Bridge No. 164 (1×18.3 + 1×24.40 + 2×30.50m CG)
    • Bridge No. 169 (1×30.05m CG)
    • Bridge No. 176 (1×30.05m CG)
    • Bridge No. 197A (1×30.50m CG)
    • Bridge No. 198 (2×24.40m CG)
    • Bridge No. 267 (1×18.30 + 2×30.50m CG)
Tunnels:
  • T8 & T9 (710m)
  • T9A (490m)
  • T9B (500m)
  • T10 (720m)
  • T11 (730m)
  • T12 & T13 (1080m)
  • T14 (620m)
  • T15 (380m)
  • T16 (750m)
  • T17 (580m)
  • T17A (580m)
  • T18, T19, T20 (1420m)
  • T21 to T27 (4220m)
  • T28 (360m)
  • T29 to T36 (5210m)
  • T37, T38, T38A (1360m)
  • T38B (350m)
Other Works:
  • Open/underground excavation.
  • Rock bolts and steel supports.
  • Shotcrete and concrete works.
  • Drainage systems.
  • Ballast-less track works.
  • Supply, erection, and testing for commissioning of E&M works.
Scope of Work
Pre-bid Engineering services for NHIDCL Package 2 include:
  • Review of Tender documents, Proposed alignment, Tunnel cross-sections & GAD drawings.
  • Review & assessment of Geotechnical & Geological data.
  • Highlighting discrepancies in tender documents and preparing technical queries.
  • Preliminary design and BOQ preparation for Civil and MEP works.
  • Preliminary Drawings & Technical notes for Tunnels & associate structures required for Prebid submission.
  • Instrumentation and monitoring scheme.
  • Likely construction methods.
  • Assessment of site constraints.
  • Response to bid queries during evaluation.
  • Site visit.
Project duration – 2023 to 2024