Project:Philippines North South Rail Corridor CP S02 Package
Authority:Department of Transportation, Philippine National Railways
Client:Gülermak Ağir Sanayi İnşaat Ve Taahhüt A.Ş. & Doğuş Construction and Trade Inc
Location:Philippines
Project Overview:
  • The North-South Commuter Railway Project (South Line) connects the PNR Solis Station in Tondo, Manila, to the PNR Calamba Station in Laguna.
  • The total length of the railway is approximately 56 kilometers.
  • There are a total of nineteen (19) stations along this route.
Project Structure:
  • The project is divided into seven packages.
  • CP S02 is a significant part of this stretch and includes the following features:
    • This stretch includes a 7.91 km elevated viaduct railway corridor.
    • Seventeen (17) bridges, including:
      • Steel box girders
      • Balanced cantilevers
      • U-bridges
      • Cast-in-situ bridges
        • Double-track operation capability.
        • Three elevated stations.
Scope of Work
Prebid Engineering services for Elevated Viaduct & Metro Stations, CP S02 Package. Our services include;
  • Quantity survey for civil works including viaducts and stations.
  • Drainage works
  • Road works
  • Station’s Architectural & Finishing works
  • Landscape works
Project duration – 2020 to 2021