Project Overview

Contract PC-06: Design & Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations namely Rukanpura, Raja Bazar & Patna Zoo. This includes Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works of Stations on Danapur to Khemnichak Corridor 1 of Phase-I of Patna MRTS

Project Overview:
  • TBM Tunnel : 3885m (Twin Tunnel)
  • Station (3 No’s) : Rukanpura (160m), RajaBazar (160m) & Patna Zoo Station (355m)
  • Ramp : 145 m
  • C&C Tunnel : 206 m
Scope of Work
Pre-bid Engineering services for Patna Metro Contract PC-06 Corridor 1 of Phase-I include:
  • Review of Tender documents
  • Geotechnical Appreciation report
  • Preliminary Design of TBM Tunnel & associated structures (CPs)
  • Design calculations and methodology for tunneling under existing railway tracks and adjacent structures
  • Ground Improvement Methodology
  • Instrumentation and monitoring scheme
  • Proposal for strengthening adjacent structures
  • Likely construction methods
  • Assessment of site constraints
  • Bill of Quantities (BOQ) for Tunnel & associated structures (CPs)
  • Sketches/Preliminary Drawings for Tunnels & associated structures (CPs) required for Prebid submission
  • Building Damage Assessment
  • Site visit
Project duration – 2024