AIZAWL BYPASS TUNNEL

AIZAWL BYPASS TUNNEL

Authority:National Highways & Infrastructure Development Corporation Limited (NHIDCL)
Client:Kalpataru Projects International Limited (KPIL)
Location:Aizawl, Mizoram (India)
Project Overview

Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package 2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.

Project Overview:

a) Tunnel Length : 2500m (Twin Tunnel with 2 Lane Carriageway)
b) Bridge : 2 Nos of Minor Bridge
c) Culvert : 8 Nos of Box Culvert
d) Wall
  • Retaining Wall = 230Rm
  • Breast Wall = 1760Rm
  • Gabion RE Wall = 6700Sqm
  • Gabion Wall = 1300Rm
Scope of Work
Pre-bid Engineering services for NHIDCL Package 2 include:
  • Review of Tender documents, Proposed alignment, Tunnel cross-sections & GAD drawings.
  • Review & assessment of Geotechnical & Geological data.
  • Highlighting discrepancies in tender documents and preparing technical queries.
  • Preliminary design and BOQ preparation for Civil and MEP works.
  • Preliminary Drawings & Technical notes for Tunnels & associate structures required for Prebid submission.
  • Instrumentation and monitoring scheme.
  • Likely construction methods.
  • Assessment of site constraints.
  • Response to bid queries during evaluation.
  • Site visit.
Project duration – 2023 to 2024