PAGOTE TO CHOWK TUNNEL
Authority: | National Highway Authority of India (NHAI) |
Client: | TPF Engineering Pvt Ltd. |
Location: | Maharashtra, (India) |
Project Name
Consultancy services for Preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal roads to improve the efficiency of freight movement in India (Lot-1/Maharashtra/Package-3) – Pagote to Chowk
Project Overview:Pagote to Chowk Project alignment begins near Pagote village at Ch.0+100 and ends at Chowk on NH-48 Ch.29+319 . Total Length of the Project is 29.219 Kms. Along the proposed alignment there are 2 nos. Twin Tunnels proposed, details are as below,
- Tunnel 1 = 1900m Approx Length
- Tunnel 2 = 1568m Approx Length
Scope of Work
Consultancy service for Preparation of feasibility study & detailed project report for Pagote to Chowk Project. Our services include:
- Geological Mapping and Surveys along with analysis and detailed report conforming to requirements of IRC: SP:91-2010 and with derivation of parameters required for Tunnel Design and Protection measures.
- Review the available Geotechnical Investigations and suggest required extents and type of Geotechnical Investigations required.
- Design of Tunnel including Portals, Protection measures such as Lining, etc., based on available data of similar projects (e.g., Pune Ring Road).
- Preparation of tender documents as part of the EPC Contract, including:
- Schedules
- Material specifications report
- Typical layout & cross-section drawings
- Bill of Quantities (BOQ) for tunnels and associated structures
- Site visits.
- Providing assistance during the tender stage.