Authority: | National Highway Authority of India (NHAI) |
Client: | APCO Infratech Pvt. Ltd |
Location: | Shimla, Himachal Pradesh (India) |
Construction of Four laning of NH-5 from Kaithlighat to Shakral Village (Shimla Bypass Package I from Km 128+835 to Km 146+300 for Design length – 17.465 Km) in the state of Himachal Pradesh on HAM
Authority: | National Highways & Infrastructure Development Corporation Limited (NHIDCL) |
Client: | Kalpataru Projects International Limited (KPIL) |
Location: | Aizawl, Mizoram (India) |
Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package 2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.