The Mumbai Coastal Road features a submerged tunnel in Package IV.
The tunnel consists of a 3,000 m long twin tube with two lanes and an emergency lane (expanded to three lanes during high traffic intensity).
It includes cross passages every 300 m and one pump shaft.
For excavation, a Hydro shield-TBM will be used.
The road is situated approximately 22 m below sea level.
Beneath Malabar Hill, the overburden at the crown reaches up to 70 m (along the shore).
The tunnel intrados has a diameter of 11 m and utilizes precast segments (referred to as “universal segments”).
Prefabricated, walkable technical canals are present at each invert.
The cut & cover intrados section measures 11 x 6.5 meters.
Ramps connect the project to the bridge viaducts in the north and the existing road network in the south, along Marine Drive.
About Technical Building
Location: The building is situated on top of a cut and cover section of LHS, with a portion integrated into it.
Structure Division: It is divided into two parts: one above the cut and cover box and the other housing a CNC system.
Purpose: The building provides dedicated electrical and mechanical services to meet the technical/engineering requirements of the tunnel beneath.
Levels:
Ground Level: Access to the technical room below and standby fire vehicles. Landscaping is proposed around and above the deck/slab. Features include a dedicated ventilation system (Saccardo Equipment), battery room, LV panel room, MV panel room, transformer room, training room, office, toilets, staircase, and approach shaft.
Scope of Work
Design of Underground Technical Building for Mumbai Coastal Road Project.
Review & assessment of proposed building
Suggest necessary changes and resolve constructability issues
Design of Underground Technical Building (North & South)
Contract PC-06: Design & Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations namely Rukanpura, Raja Bazar & Patna Zoo. This includes Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works of Stations on Danapur to Khemnichak Corridor 1 of Phase-I of Patna MRTS
Project Overview:
TBM Tunnel : 3885m (Twin Tunnel)
Station (3 No’s) : Rukanpura (160m), RajaBazar (160m) & Patna Zoo Station (355m)
Ramp : 145 m
C&C Tunnel : 206 m
Scope of Work
Pre-bid Engineering services for Patna Metro Contract PC-06 Corridor 1 of Phase-I include:
Review of Tender documents
Geotechnical Appreciation report
Preliminary Design of TBM Tunnel & associated structures (CPs)
Design calculations and methodology for tunneling under existing railway tracks and adjacent structures
Ground Improvement Methodology
Instrumentation and monitoring scheme
Proposal for strengthening adjacent structures
Likely construction methods
Assessment of site constraints
Bill of Quantities (BOQ) for Tunnel & associated structures (CPs)
Sketches/Preliminary Drawings for Tunnels & associated structures (CPs) required for Prebid submission