Contract PC-06: Design & Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations namely Rukanpura, Raja Bazar & Patna Zoo. This includes Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works of Stations on Danapur to Khemnichak Corridor 1 of Phase-I of Patna MRTS
Project Overview:
TBM Tunnel : 3885m (Twin Tunnel)
Station (3 No’s) : Rukanpura (160m), RajaBazar (160m) & Patna Zoo Station (355m)
Ramp : 145 m
C&C Tunnel : 206 m
Scope of Work
Pre-bid Engineering services for Patna Metro Contract PC-06 Corridor 1 of Phase-I include:
Review of Tender documents
Geotechnical Appreciation report
Preliminary Design of TBM Tunnel & associated structures (CPs)
Design calculations and methodology for tunneling under existing railway tracks and adjacent structures
Ground Improvement Methodology
Instrumentation and monitoring scheme
Proposal for strengthening adjacent structures
Likely construction methods
Assessment of site constraints
Bill of Quantities (BOQ) for Tunnel & associated structures (CPs)
Sketches/Preliminary Drawings for Tunnels & associated structures (CPs) required for Prebid submission