We are involved in international as well as national projects across country

NATM TUNNEL + Railway

Scope of Work

Pre-bid Engineering services for NHIDCL Package 2 include:

  • Review of Tender documents, Proposed alignment, Tunnel cross-sections & GAD drawings.
  • Review & assessment of Geotechnical & Geological data.
  • Highlighting discrepancies in tender documents and preparing technical queries.

NATM TUNNEL + Highway

Project Name

Rehabilitation and Upgradation to 4-lane road from km. 157+000 to km. 193+407, Jwalamukhi Bypass to Kangra Bypass up to intersection of NH 154 of Shimla to Mataur section of NH-88 in the state of Himachal Pradesh on HAM Mode

Scope – Detailed design of MEP & Ventilation design for 590m twin tunnel

NATM TUNNEL + Highway

Project Name

Consultancy Services for preparation of Feasibility Study/Detailed Project Report of Pune Ring Road, Urse to Paud Road to Khed Shivapur, Phase-II (Western Part)

Project Overview:

NATM TUNNEL + Highway

Project Name

Construction of Four laning of NH-5 from Kaithlighat to Shakral Village (Shimla Bypass Package I from Km 128+835 to Km 146+300 for Design length – 17.465 Km) in the state of Himachal Pradesh on HAM

NATM TUNNEL + Highway

Project Overview

Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package 2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.

NATM TUNNEL + Highway

Scope of Work

Proof Consultancy Services for Delhi-Vadodara Green Field Alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan on EPC mode.

  • Temporary & Permanent Structures of Twin Tunnel
  • Cross-Passages & Ramps
  • Emergency layby for Tunnel

NATM TUNNEL + Highway

Scope of Work

Proof checking of Tunnel & associated structures for Bharatmala Pariyojana on EPC Mode (PKG-2).

  • Review of Tunnel & Portals Design
  • Geotechnical, Hydrological Investigations & Topographical survey reports review & share observations
  • Review characteristics of materials from borrow areas and quarry sites

UNDERGROUND STRUCTURE + CUT & COVER

Project Overview
  • The Mumbai Coastal Road features a submerged tunnel in Package IV.
  • The tunnel consists of a 3,000 m long twin tube with two lanes and an emergency lane (expanded to three lanes during high traffic intensity).
  • It includes cross passages every 300 m and one pump shaft.
  • For excavation, a Hydro shield-TBM will be used.

Temporary Strutting

Project Overview
  • The Mumbai Coastal Road features a submerged tunnel in Package IV.
  • The tunnel consists of a 3,000 m long twin tube with two lanes and an emergency lane (expanded to three lanes during high traffic intensity).
  • It includes cross passages every 300 m and one pump shaft.
  • For excavation, a Hydro shield-TBM will be used.

UG METRO + Temporary Strutting

Scope of Work

Sub-consultancy Engineering services for detail design of Temporary structures for stations include:

  • Design of Temporary Strutting System
  • For Underground Metro Station.
  • Gantry Girder and Support Design
  • For Underground Metro Station.