Authority: | East Coast Railway |
Location: | Andhra Pradesh (India) |
Authority: | National Highway Authority of India (NHAI) |
Client: | TPF Engineering Pvt Ltd. |
Location: | Maharashtra, (India) |
Consultancy services for Preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal roads to improve the efficiency of freight movement in India (Lot-1/Maharashtra/Package-3) – Pagote to Chowk
Project Overview:Pagote to Chowk Project alignment begins near Pagote village at Ch.0+100 and ends at Chowk on NH-48 Ch.29+319 . Total Length of the Project is 29.219 Kms. Along the proposed alignment there are 2 nos. Twin Tunnels proposed, details are as below,
Consultancy service for Preparation of feasibility study & detailed project report for Pagote to Chowk Project. Our services include:
Authority: | National Highway Authority of India (NHAI) |
Client: | Oriental Structural Engineers Pvt. Ltd. |
Location: | Jammu & Kashmir, (India) |
Technical due diligence works for operation and maintenance of 4-laning of Quazigund to Banihal section from km 189.350 to km 205.618 Of NH 1a including twin tube tunnels of 8.45km length on BOT(Annuity) basis in the Union Territory of Jammu & Kashmir.
The scope of work for the technical due diligence is defined here as under: Scope of Services
Authority: | National Highway Authority of India (NHAI) |
Client: | LEA Associates South Asia (LASA) |
Location: | Himachal Pradesh (India) |
Rehabilitation and Upgradation to 4-lane road from km. 157+000 to km. 193+407, Jwalamukhi Bypass to Kangra Bypass up to intersection of NH 154 of Shimla to Mataur section of NH-88 in the state of Himachal Pradesh on HAM Mode
Scope – Detailed design of MEP & Ventilation design for 590m twin tunnel
Consultancy service for Detailed design of MEP for tunnel. Our services include:
Authority: | Maharashtra State Road Development Corporation Ltd. |
Client: | TPF Engineering Pvt Ltd. |
Location: | Pune, Maharashtra, (India) |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of Pune Ring Road, Urse to Paud Road to Khed Shivapur, Phase-II (Western Part)
Project Overview:
The Project Expressway is part of the Pune Ring Road’s west side, a six-lane divided carriageway with full access control, passing through Green Field area in the state of Maharashtra. The project is divided in to three packages.
Consultancy service for Preparation of feasibility study & detailed project report for Pune Ring Road, URSE to Paud Road to Varve (Bk) (Western Part). Our services include:
Authority: | National Highway Authority of India (NHAI) |
Client: | APCO Infratech Pvt. Ltd |
Location: | Shimla, Himachal Pradesh (India) |
Construction of Four laning of NH-5 from Kaithlighat to Shakral Village (Shimla Bypass Package I from Km 128+835 to Km 146+300 for Design length – 17.465 Km) in the state of Himachal Pradesh on HAM
Authority: | National Highways & Infrastructure Development Corporation Limited (NHIDCL) |
Client: | Kalpataru Projects International Limited (KPIL) |
Location: | Aizawl, Mizoram (India) |
Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package 2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.
Project Overview:
a) Tunnel Length : 2500m (Twin Tunnel with 2 Lane Carriageway)Authority: | National Highway Authority of India (NHAI) |
Client: | TPF Engineering Pvt. Ltd. |
Location: | Rajasthan, (INDIA) |
Authority: | National Highway Authority of India (NHAI) |
Client: | TPF Engineering Pvt. Ltd. |
Location: | Dehradun, (INDIA) |
Project Name: | Mumbai Costal Road Project – Package IV |
Authority: | Municipal Corporation of Greater Mumbai |
Client: | Lombardi Engineering Group |
Location: | Mumbai, Maharashtra (India) |